Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the comments-ratings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the contempo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Castaic - Glenda Martinez

Castaic

Castaic includes Castaic Lake and lies at the southern terminus of the west branch of the California Water Project. A 1,175-megawatt pumped-storage hydroelectric plant at the north end of Castaic Lake captures the energy from the falling water descending toward the Los Angeles area.

Today travelers enjoy visiting Castaic for its spacious country setting and lake. Nearby amenities include Castaic Lake and Pyramid Lake, where camping, boating and swimming are available.